• Monster Jam Liwa

    A desert performance arena for monster trucks supported by 4,000-seat grandstands, a multi-level VIP structure, crowd infrastructure and full event power.

    Monster Jam brought its monster-truck performance to the Liwa Desert for two days on 27 and 28 December 2023. Evolution partnered with Proactive to design and deliver the temporary event environment around the show.


    The central idea was visibility. Spectators needed clear views of the truck action, VIP guests required a premium elevated experience, and the operational compound needed enough infrastructure to support heavy machinery, guest services and performance activity in a remote desert location.


    Evolution organised the site as a complete motorsport venue, connecting the obstacle course, grandstands, VIP hospitality, crowd-control systems, lighting and power within one operating plan.

    The Challenge


    Liwa provided the scale and landscape for the spectacle but little permanent event infrastructure. Seating, hospitality, fencing, cabins, lighting, power and operational support all had to be introduced temporarily and perform reliably in desert conditions.


    The truck obstacle course also required machinery and specialist site activity close to the live performance area. Public circulation, vehicle movement and guest facilities needed to remain clearly separated without weakening the audience’s connection to the action.

    Monster trucks performing aerial stunts on custom built dirt jump ramps in Liwa arena

    The Solution


    Evolution developed the overall layout around the truck performance zones and spectator sightlines. Grandstand seating for 4,000 guests created a defined public arena, while fencing established crowd boundaries and protected operational routes.


    A custom VIP hospitality structure was built from scaffolding and equipped with a working elevator. The elevated format gave premium guests strong views while creating a complete service environment within the temporary venue.


    Machinery was supplied and operated for construction of the truck obstacle course, aligning the physical performance landscape with the requirements of the show.


    Main and secondary power, distribution and supporting infrastructure were delivered across the venue, while full event lighting, cabins, tents, buggies and containers enabled the site to function throughout the two-day programme.

    Delivery Highlights


    • Two-day Monster Jam event in Liwa Desert on 27 and 28 December 2023.
    • Overall venue layout covering seating, VIP hospitality and truck performance zones.
    • Grandstand seating for 4,000 spectators.
    • Custom scaffold VIP hospitality structure with a fully functional elevator.
    • Machinery supplied and operated for construction of the obstacle course.
    • Crowd-control fencing and temporary operational support facilities.
    • Main and secondary power distribution with full venue lighting.
    Evolution Scenic built entrance portal welcoming motorsport fans to Liwa arena venue

    Outcome


    The temporary site operated as a complete motorsport destination rather than an isolated performance track. Public spectators, VIP guests, production teams and heavy vehicles each had clearly planned spaces within the same desert environment.


    The spectacle remained the focus because the seating, infrastructure and operations gave audiences a reliable way to experience the scale, noise and movement of Monster Jam safely and comfortably.

    Project Ecosystem


    Delivery partner: Proactive


    Evolution Events: Led venue planning, Proactive coordination, obstacle-course operations, temporary facilities and live event management.


    Evolution Technical: Delivered the confirmed full-venue lighting required for evening operation and spectacle visibility.


    Evolution Site Services: Provided the confirmed main and secondary power, distribution, cabling and supporting event infrastructure.

  • Expo 2020 Closing Ceremony

    A giant gold Expo ring suspended 20 metres above the stage transformed into a concealed rain curtain for the closing ceremony at Al Wasl Dome.

    For the Expo 2020 Dubai Closing Ceremony, Five Currents LLC commissioned Evolution to create a giant suspended gold ring inspired by the Expo emblem.


    The structure needed to serve two purposes: a visually striking symbol above the stage and a fully engineered performance element capable of releasing a seamless curtain of rain during the ceremony.


    Evolution translated the conceptual design into a flyable scenic structure integrating concealed water tanks and technical systems. The result was a dramatic transformation moment that remained hidden from the audience until activation.

    The Challenge


    The ring needed to remain structurally secure while suspended approximately 20 metres above the stage, while maintaining the refined appearance of a simple gold emblem. All engineering components, including the concealed water system, needed to remain hidden from the audience.


    Water behaviour, structural loading, surface finish, rigging and live show timing all required precise coordination. Each element had to perform reliably as part of one integrated scenic and technical system to deliver the intended ceremonial moment.

    Evolution Events delivered the suspended scenic centrepiece for the Expo 2020 closing celebration

    The Solution


    Evolution engineered the ring as a combined scenic feature and water-performance mechanism. Concealed tanks and distribution technology were integrated within the form without interrupting its circular profile or refined gold finish.


    The design was developed around the requirements of suspension and movement, with stringent safety considerations and coordination with the Al Wasl Dome rigging system informing load paths, connection points and final positioning.


    Materials and finishes were carefully selected to preserve the elegance of the Expo-inspired emblem while meeting the durability requirements of a suspended live-effect feature.


    Extensive testing aligned water flow, rigging, positioning and show timing, allowing the ring to transform into a continuous rain curtain during the ceremony before returning seamlessly to its role as a visual symbol.

    Delivery Highlights


    • Giant gold ring inspired by the Expo 2020 emblem.
    • Suspended approximately 20 metres above the stage at Al Wasl Dome.
    • Hidden water tanks and rain-curtain technology integrated within the structure.
    • Engineering for a large-scale flown scenic installation.
    • High-quality gold finish concealing the functional systems.
    • Integration with the Al Wasl Dome rigging system.
    • Extensive testing of water flow, positioning and live operation.
    closing ceremony at Al Wasl Dome of Expo 2020

    Outcome


    The ring delivered a final transformation that turned a familiar Expo symbol into a theatrical rain curtain above the stage. The moment appeared effortless to the audience, yet relied on complex engineering, precise timing and integrated scenic technology.


    Its impact depended on concealment. Guests experienced the visual simplicity of gold, scale and falling water, while the tanks, distribution systems, rigging and engineering remained seamlessly integrated within the scenic form.

    Project Ecosystem


    Client:

    Five Currents LLC


    Evolution Events: Led project coordination with Five Currents, production planning, testing, show integration and ceremonial delivery.


    Evolution Scenic: Translated the concept into the giant gold ring, integrating the structure, concealed tanks, water system and finished scenic form.


    Evolution Technical: Coordinated the confirmed flown installation, rigging-system integration and technical control required for the live rain-curtain effect.

  • Expo 2020 Opening Ceremony

    Six kinetic flowers spiralled, twisted and bloomed beneath Al Wasl Dome, combining scenic craft, fibre-optic light and performer-led movement.

    For the Expo 2020 Dubai Opening Ceremony, Five Currents LLC commissioned Evolution to realise six mechanised scenic flowers beneath Al Wasl Dome.


    The elements needed to carry the delicacy and organic movement of blooming flowers at a scale appropriate to one of the world’s largest ceremonial stages. Their purpose was not simply to decorate the performance, but to move with the choreography and contribute to its emotional rhythm.


    Evolution translated the conceptual design into engineered scenic objects that combined material craft, kinetic movement, colour-changing light and mobile operation.

    The Challenge


    Organic movement is difficult to reproduce through mechanical construction. Petals needed to spiral, twist and open naturally while the complete objects remained durable, controllable and safe around performers.


    The flowers also had to maintain visual presence inside the vast Al Wasl Dome. Light, colour and motion needed to remain legible at ceremony scale without making the engineering visible.

    Royal protocol seating box styled with bespoke contemporary furniture inside Al Wasl Plaza

    The Solution


    Evolution engineered the six flowers using wood, metal and fabric, selecting each material for its contribution to structure, flexibility and surface character.


    Fibre-optic lamps and cables introduced colour-changing illumination along the sides and ends of the floral forms. The lighting was integrated into the construction so the petals could glow and change without losing their sculptural quality.


    Repeated testing refined the kinetic sequence until the flowers could spiral, twist and bloom with a more natural progression. Mechanical systems were tuned around the choreography rather than operated as isolated effects.


    Custom mobile bases offered manual and battery-powered wireless movement, allowing performers to reposition the scenic elements and maintain the relationship between the flowers and the live stage picture.

    Delivery Highlights


    • Six mechanised scenic flower elements for the Expo 2020 Opening Ceremony.
    • Engineering developed from the supplied conceptual designs.
    • Construction using wood, metal and fabric.
    • Colour-changing fibre-optic lamps and cables integrated into the petals.
    • Kinetic motion enabling spiralling, twisting and blooming sequences.
    • Continuous testing and refinement around the live choreography.
    • Manual and battery-powered wireless mobile bases.
    Al Wasl Dome illuminated with 360-degree projection mapping during grand opening ceremony.

    Outcome


    The flowers introduced a living scenic language into the opening ceremony. Their changing colour and unfolding motion complemented the performers while remaining visually strong within the scale of Al Wasl Dome.


    Artistry and engineering were concealed within the action: audiences saw flowers bloom, while the structural, mechanical and wireless systems supporting the moment remained out of view.

    Project Ecosystem


    Client:

    Five Currents LLC


    Evolution Events: Led project and client coordination with Five Currents, production planning, testing schedules and ceremonial delivery.


    Evolution Scenic: Designed, engineered and fabricated the six flower structures, kinetic petals and mobile bases.


    Evolution Technical: Integrated the fibre-optic lighting, colour-changing systems, wireless functionality and controlled scenic movement.

  • E1 Jeddah

    AVL, event power, infrastructure and FF&E coordinated as one waterfront production platform for the world’s first electric race-boat championship.

    E1 is the world’s first electric race-boat championship, created to combine competitive on-water racing with cleaner technologies and a greater awareness of coastal environments.


    For the Jeddah leg, STAMINA Productions appointed Evolution to oversee project management and deliver a turnkey production package spanning AVL, site services and FF&E.


    The strategic requirement was coherence. Technical systems, guest environments and waterfront infrastructure needed to operate as one connected experience, ensuring the championship’s focus on innovation was reflected through the precision, quality and delivery of the live event.

    Panoramic aerial shot of Jeddah waterfront race venue glowing during evening finals

    The Challenge


    Waterfront sporting events distribute production requirements across large, exposed environments. Audio, video, lighting, power, cabling and guest facilities must remain reliable while supporting clear movement between race operations, hospitality areas and spectator zones.


    The event also involved several stakeholder groups, including E1, MOS and SWSDF. Their technical, logistical and operational requirements needed to be aligned early, ensuring different systems could integrate effectively without creating operational conflicts or late changes across the venue.

    The Solution


    Waterfront sporting events require production systems to operate across large, exposed environments where technical reliability and guest experience must be managed together. Audio, video, lighting, power, cabling and guest facilities needed to remain consistent while supporting the movement of race operations, hospitality areas and spectator zones.


    The event also involved several stakeholder groups, including E1, MOS and SWSDF, each with specific technical, logistical and operational requirements. These elements needed to be coordinated early to ensure systems integrated effectively, responsibilities remained clear and the waterfront environment could operate as one unified event space.

    Delivery Highlights


    • Turnkey production support for the Jeddah leg of the E1 championship.
    • Integrated audio, video and lighting systems.
    • Confirmed power distribution, cabling and infrastructure management.
    • Design, supply and installation of FF&E.
    • Coordination with E1, MOS and SWSDF stakeholders.
    • Central alignment of technical, logistical and operational requirements.
    General viewing area creating with custom flooring, signages and hospitality suites by Evolution

    Outcome


    The championship received a unified production environment capable of supporting racing operations, hospitality and stakeholder activity along the waterfront. Guests experienced one consistent event setting, where technical delivery, guest facilities and spatial design worked together rather than appearing as separate elements.


    The coordinated approach supported E1’s innovation-led positioning by creating an event environment that felt precise, functional and contemporary, reflecting the character of the electric racing programme.

    Project Ecosystem


    Client:

    Ministry of Sport / Saudi Water Sports and Diving Federation / E1


    Evolution Events: Led project management in partnership with Stamina, stakeholder alignment, production planning, logistics and live delivery for the Jeddah event.


    Evolution Technical: Delivered the confirmed audio, video and lighting systems supporting the championship environment.


    Evolution Furniture: Designed, supplied and installed the confirmed FF&E package for guest, hospitality and operational spaces.


    Evolution Site Services: Delivered the confirmed power distribution, cabling and infrastructure management across the waterfront site.

  • Cirque du Soleil Saudi National Day

    Stéphane Roy's stage designs translated into engineered scenic structures, bespoke props and a complete cross-border production for Saudi National Day.

    For Saudi National Day 2022, Cirque du Soleil presented a large-scale performance in Riyadh built around expressive stage design, performers and custom scenic objects.


    Evolution collaborated with renowned stage designer Stéphane Roy to translate the creative vision into a complete physical production. The role was one of disciplined realisation: preserving the artistry of the original designs while resolving how every component would be engineered, fabricated, transported and installed.


    The result was a scenic system in which structural performance and visual storytelling were inseparable. Props, automated elements and stage components needed to feel theatrical onstage while meeting the practical demands of an international touring-standard production.

    The Challenge


    Complex scenic concepts often begin as expressive forms rather than construction packages. Each design had to be converted into buildable geometry, material specifications, structural details and mechanisms without losing the movement or character intended by the stage designer.


    The production was fabricated in Dubai and delivered to Riyadh. That made transport planning, packing, reassembly and installation part of the design process, because every element had to arrive in sequence and perform exactly as intended on the Saudi stage.

    The Solution


    Evolution developed the technical design for the complete scenic package, converting the supplied creative direction into detailed fabrication and construction solutions.


    The build drew on metalwork, carpentry, 3D production, fibreglass, automation, electronics and specialist painting. This mix allowed structural scenic components and bespoke stage props to carry both the visual detail and physical resilience required by the performance.


    Automation and electronic systems were integrated into the scenic construction where movement or live control formed part of the design. These systems were tested alongside the physical components rather than treated as separate technical additions.


    All elements were prepared for cross-border transport from the UAE to Saudi Arabia, then installed and assembled in Riyadh through a coordinated production sequence designed around the show programme.

    Delivery Highlights


    • Creative collaboration with Cirque du Soleil stage designer Stéphane Roy.
    • Complete technical design and scenic production package.
    • Metal fabrication, carpentry, 3D production, fibreglass, automation, electronics and specialist painting.
    • Bespoke props and structural scenic components built to exacting performance standards.
    • Full stage construction and scenic installation.
    • Cross-border transportation of the scenic package from Dubai to Riyadh.
    Image description

    Outcome


    The finished stage retained the imaginative quality of the original concept while operating as a robust live-performance environment. Audiences experienced an expressive Cirque du Soleil world rather than the engineering, logistics and fabrication systems behind it.


    The strength of the delivery lay in faithful translation: the creative vision remained visible, while the complexity required to build, move and install it stayed embedded within the production.

    Project Ecosystem


    Client:

    Cirque du Soleil


    Evolution Events: Led project coordination, cross-border logistics, installation planning and delivery liaison around the Cirque du Soleil production schedule.


    Evolution Scenic: Developed the technical design and delivered the complete fabrication, automation, scenic construction, transport preparation and onsite installation package.


  • UAE 50th National Day

    One hundred illuminated building replicas rose from the stage at Hatta Dam, turning five decades of national development into a synchronised kinetic skyline.

    The UAE’s 50th National Day celebration at Hatta used the landscape of Hatta Dam as the setting for a performance tracing the nation’s progress and achievements.


    Evolution collaborated with LarMac Projects ME Limited to create 100 telescopic lightboxes based on iconic UAE buildings. Together, the structures formed a scenic narrative of national development rather than a conventional architectural backdrop.


    The creative concept relied on movement, scale and illumination. Each structure needed to rise from the stage, maintain the recognisable proportions of its architectural reference and perform as part of a synchronised landscape of light that remained legible across the dam.

    The Challenge


    Every building required its own visual identity while operating as part of one mechanical system. Taller structures needed up to four telescoping tiers, custom lifting mechanisms and sufficient stability for live performers working nearby.


    The mountainous setting introduced high winds, rain and humidity. The scenic elements also had to retract into the stage floor and operate reliably within a live performance where timing and synchronisation were critical.

    Massive curved water screen projection system displaying historical UAE documentary visuals

    The Solution


    Evolution designed, supplied, installed and operated 100 custom lightboxes, each modelled on an iconic UAE building and adjusted to retain relative scale differences within the stage composition.


    Heavy-duty industrial tracks and telescopic tower mechanisms allowed the structures to emerge and retract. Multi-tier designs were engineered for taller buildings, translating the varied national skyline into a workable kinetic system.


    Independently controlled LEDs created dimensional lighting across each replica. All 100 elements were connected through a single electrical control circuit, allowing colour and sequence changes to be synchronised from a command position approximately 30 metres away.


    Structural design, testing and live operation were developed around weather exposure, performer safety and the precision required for the buildings to rise as part of the choreography.

    Delivery Highlights


    • One hundred custom telescopic replicas of iconic UAE buildings.
    • Scenic sequence staged on an artificial pool at the edge of Hatta Dam.
    • Up to four telescoping tiers for the tallest building structures.
    • Custom lifting mechanisms and heavy-duty industrial tracks.
    • Independently controlled LED lighting within every lightbox.
    • Synchronised control through one electrical circuit from 30 metres away.
    • Engineering for high winds, rain, humidity and live performer safety.
    Monumental floating stage structure built over water for national day theatrical performance

    Outcome


    The buildings transformed national progress into a live visual event. As the illuminated skyline emerged from the stage, architecture became a moving timeline rather than a static symbol.


    The precision of the mechanical and lighting systems allowed 100 individual structures to read as one national image, creating a powerful centrepiece within the Hatta landscape.

    Project Ecosystem


    Client:

    UAE Governement / LarMac Projects ME Limited


    Evolution Events: Led project coordination with LarMac Projects ME Limited, production planning, installation sequencing and live scenic operation.


    Evolution Scenic: Designed, engineered, fabricated, installed and operated the 100 telescopic building lightboxes and lifting structures.


    Evolution Technical: Delivered the LED integration, electrical control, synchronised colour sequences and technical operation of the kinetic skyline.